Search
×

LBS 24KV 630a SF6 Gas Load Break Switch Application


The SF6 LBS 24kv 630A gas-insulated switch is a three-phase interoperable switching device designed for use in electrical distribution cabinet cabling and overhead power line segment applications.

The 24KV pole mounted disconnect switch can be operated manually in the field or remotely from the control center.


LBS 24KV 630a SF6 Gas Load Break Switch Technical Parameters

Products TypeFWX-24
Basic Ratings
Maximum System Voltage24kV
Rated Continuous Current630A
Rated Frequency50/60Hz
Short Time Withstand Current16kA/1sec
Making and Breaking Capacity
Mainly Active Load Current630A
Number of Load-break Operations400times
Short-circuit Making Current (peak)40kA
Number of Making Operations5 times
Cable Charging Current25A
Line Charging Current1.5A
Closed Loop Circuit Current630A
Transformer Magnetizing Current22A
Power Frequency Withstand Current Test
Wet Condition-10sec Ph- Ph-Eth, Across Interrupters50kV
DryCondition-1min,Ph- Ph, Phase to Earth64kV
Dry Condition - 1 min Across Interrupter79kV
Impulse Withstand Current Test( 1.2 x 50 µs )
Phase to Phase, Phase to Earth125kV
Across Interrupter145kV
Other Ratings & Specifications
Internal Arc Test20kA /0.1 sec
Arc Extinction MediumSF6 Gas
Insulation MediumSF6 Gas
Creepage Distance (Porcelain)700mm
Creepage Distance (Silicon)1200mm
Dry arcing distance
IP Level65
Operation Performance
Closing/Opening Time<1sec
Mechanical Operations (Guaranteed)10000times
Operating Temperature (*Manual Type)-25~+70℃
Gas Pressure
Nominal Pressure (MPa, at 20°C)0.07
Bursting Pressure (MPa)0.4~0.6
Minimum Gas Pressure (MPa)0.05
Leakage Rate (cc/ sec)≤0.5%
Voltage sensors
CT ABC   10P10   5VA400:05:00
Incoming side and outgoing side of the voltage sensor

6 Voltage sensor(built-in)                    

Phase voltage:(24(36)kV/√3)/(3.25V/√3)

Special attention should be paid to the voltage sensor, which must be directly fed by the LBS load break switch. 

No additional adjustment circuit can be added to the controller. The voltage signal of the switch into the test line needs to be tested separately.



Mulai kemitraan Anda dengan goower

We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Visit our cookie policy to learn more.
Reject Accept